| Scope | Individual machine | Connected equipment package |
|---|---|---|
| First enquiry | Selected duty and incoming material | Wanted product and process endpoint |
| Connections | Feed, outlet and utility boundary | Transfers and material paths between supplied machines |
| Controls | Local drive and operating functions | Machine availability, shared signals and line requests |
| Acceptance | Agreed machine checks | Machine checks plus the connected process boundary |
Start at the scale you need
You can request one machine without preparing a complete factory specification. Describe the equipment being replaced or added and the feed and receiving arrangement.
Build the package from real duties
A larger scope identifies each machine, joining equipment and retained site asset. Preparation, recovery, treatment and packaging remain distinct choices within that package.


